Previous
Next
VIERNES 19 ABRIL 2019
Español (spanish formal Internacional)CatalanEnglish (United Kingdom)FrenchPortugués
PROJECTS

MARINA BADALONA – THE LARGEST INSTALLATION OF TALLYCARD+ TURRETS 
Marina Badalona, the new maritime sea front of the city of Badalona, with 650 moorings for vessels 8 - 30 metes long.
Equiport has collaborated in its construction with FCC, supplying and fitting 195 pedestals in a first phase with subsequent enlargements. All using the Tallycard+ user identification system and some programs with pre-payment system as well as the control of all the accesses, parking and services. Equiport has developed the MB bollard, a distinctive feature for this occasion, fitting 822 units as well as the entire anchoring system. The workshop is equipped with a travelift ASCOM BHT75, supplied, fitted and maintained by Equiport.
Marina Ibiza – THE LARGEST INSTALLATION OF TALLYBEE PEDESTALS

Marina Ibiza has invested more than 32 million Euros in refurbishment, becoming one of the most exclusive ports for vessels up to 100 m.
Equiport has equipment for large lengths vessels with an elegant design, contributing to the image of the high level installations (Similar actions took place in Puerto Portals and Port Adriano). The engineering team and works management have entrusted y Equiport with the work for the 4th time, supplying 275 pedestals of up to 400A with Tally Bee control system, enabling remote real time reading of consumption at the moorings. Safety is covered with 20 Km of mooring lines, 38 Tm of chain, 275 design  bollards and many other complements.

 
Port America's Cup – THE FIST AMERICA'S CUP IN EUROPE
The 32nd America's Cup in Valencia. Our largest commission made in a record time, simultaneous work teams on different places, technical modifications during work progress. The result of days and nights of work. All ready for opening!
One million m2 of surface area, a marina for more than 600 vessels and all the services for superyachts. This work included the supply and installation of 370 Tally T-2, T-6 and T-8 service turrets de servicio for vessels of more than 100 m length, with sockets for up to 600 A and all the services of a top level Marina, including 150 bollards. Emblematic for Equiport was the supply, installation and maintenance of the ASCOM 40 Tm. travelift for the "Desafío Español".